Yield/FITEC Biogas Plant References Summary Table

Number

Plant Type, Name, Location

Feedstock Amount/Type

Role of FITEC in Project

1

Biogas Plant Garmisch-Parten Kirschen

10,000 tonnes/a; Municipal organic waste and commercial foodwaste from grocery stores, restaurants and food processors.

Approval planning, design, engineering and equipment supply, installation and commissioning.

2

Biogas Plant Rothmühle

30,000 tonnes/a; Municipal organic waste and commercial foodwaste from grocery stores, restaurants and food processors.

Approval planning, design, engineering, equipment supply, installation and commissioning.

3

Biogas Plant Biorender AG, Switzerland

5,000 tonnes/a; Commercial food waste from grocery stores, restaurants and food processors

Design, engineering, equipment supply and installation.

4

Restaurant Waste Treatment & Biogas Facility, Chongqing, China

75,000 tonnes/a; Contaminated restaurant waste.

Planning approval, design, engineering, equipment supply, installation and commissioning.

5

Organic Transfer Station, HEM Energy Group, Sweden

10,000 tonnes/a; Contaminated grocery and restaurant food waste

Equipment, installation supply and commissioning.

6

Biogas Plant, Langage AD, UK

15,000 tonnes/a Restaurant food waste , manure, 713 kWel.

Planning approval, design, engineering, equipment supply, installation and commissioning.

7

Sequenced Batch Reactor, Agroenergie Bergamasche S.C.A., Italy

215 m3/d centrate water from digestate de-watering at food waste biogas plant.

Design & engineering of SBR.

8

Biogas Plant Berthelsdorf GmbH & Co. KG, Germany

10,000 tonnes/a; Energy crops with FITEC contaminant removal system for conversion to food waste.

Planning approval, design, engineering, equipment supply, construction management, installation and commissioning.

9

Biogas plant Buchholz Luxemburg, Expansion Phase

5,000 tonnes/a; Food waste and bio-waste and 2,550 to/a agricultural substrates, 270 kWel.

Preliminary design and detailed design of an expansion to a food waste processing plant. Equipment supply and installation, commissioning.

10

Waste Water Treatment Plant, Moosburg GmbH, Germany

75 m3/d centrate from waste water sludge;
69 kg/d nitrogen reduction

Design & engineering of SBR.

11

Bioenergie Schlitters GmbH, Austria

6,000 tonnes/a; Municipal SSO, grocery store, restaurant food waste, 300 kWel.

Planning approval, design, engineering, equipment supply, installation and commissioning

12

Biogas Plant Kaiserwinkel GmbH, Austria

4,000 tonnes/a; Municipal SSO, restaurant food waste, 200 kWel.

Design & engineering, equipment supply and installation, commissioning.

13

Biopower Bernau GmbH & Co. KG, Phase 2 expansion.

6,000 tonnes/a; Municipal SSO, restaurant food waste,300 kW el.

Design, engineering, installaion of 1 Self-cleaning digester, construction management, commissioning.

14

Biopower Bernau GmbH & Co. KG.

3,000 tonnes/a municipal SSO, restaurant food waste.

Design & engineering, installation, construction management, commissioning.